Absorption disposal systems must be sited across the gradient of the site and may be used in series i.e. 2 x 3 m³ if space becomes a problem (see diagram below).
The absorption disposal system is required to be located a minimum three (3) metres from the allotment boundaries and at least five (5) metres away from all buildings. The system must not be placed under any paved surfaces and must be at least one (1) metre away from pavements subject to vehicular traffic.