Use space to open navigation items
Wollongong City Council

Development Contributions Register

Showing 1 - 100 of 5056 items
Application NumberApplication Number AddressAddress DescriptionDescription Decision DateDecision Date Decision TypeDecision Type Estimated Cost of DevelopmentEstimated Cost of Development Contributions PlanContributions Plan Total Contribution LeviedTotal Contribution Levied Total Contributions PaidTotal Contributions Paid Payment DatePayment Date Total Contribution OutstandingTotal Contribution Outstanding
Application NumberDA-2019/84 Address
135 New Mount Pleasant Road, MOUNT PLEASANT NSW 2519
DescriptionResidential - multi dwelling housing comprising of three (3) x two (2) storey townhouses and Subdivision - Torrens title - three (3) lots Decision Date12/06/2019 Decision TypeApproved Estimated Cost of Development$879,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$8,790.00 Total Contributions Paid-$8,790.00 Payment Date20/06/2019 Total Contribution Outstanding$-
Application NumberDA-2019/272 Address
18 Chalmers Street, BALGOWNIE NSW 2519
DescriptionResidential - demolition of the existing garage and rear of dwelling and proposed additions Decision Date12/04/2019 Decision TypeApproved Estimated Cost of Development$176,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$880.00 Total Contributions Paid-$880.00 Payment Date6/05/2019 Total Contribution Outstanding$-
Application NumberPC-2019/324 Address
70 Nannawilli Street, BERKELEY NSW 2506
DescriptionTwo storey dwelling Decision Date12/03/2019 Decision TypeApproved Estimated Cost of Development$400,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,000.00 Total Contributions Paid-$4,000.00 Payment Date20/03/2019 Total Contribution Outstanding$-
Application NumberDA-2019/98 Address
66 Phillip Street, THIRROUL NSW 2515
DescriptionResidential - alterations and additions Decision Date12/03/2019 Decision TypeApproved Estimated Cost of Development$110,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$550.00 Total Contributions Paid-$550.00 Payment Date17/04/2019 Total Contribution Outstanding$-
Application NumberDA-2019/471 Address
27 The Waves, THIRROUL NSW 2515
DescriptionResidential - demolition of existing dwelling house, removal of four (4) trees and construction of new dwelling house and retaining wall Decision Date11/06/2019 Decision TypeApproved Estimated Cost of Development$719,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$7,190.00 Total Contributions Paid-$7,190.00 Payment Date30/06/2019 Total Contribution Outstanding$7,190.00
Application NumberPC-2019/442 Address
239 Rothery Street, CORRIMAL NSW 2518
DescriptionResidential - alterations and additions Decision Date11/04/2019 Decision TypeApproved Estimated Cost of Development$110,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$550.00 Total Contributions Paid-$550.00 Payment Date24/04/2019 Total Contribution Outstanding$-
Application NumberPC-2019/325 Address
18 Young Street, COLEDALE NSW 2515
DescriptionAlterations and additions Decision Date11/03/2019 Decision TypeApproved Estimated Cost of Development$182,300.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$911.50 Total Contributions Paid-$911.50 Payment Date28/05/2019 Total Contribution Outstanding$-
Application NumberPC-2019/317 Address
3 Warehouse Place, BERKELEY NSW 2506
DescriptionWarehouse Decision Date11/03/2019 Decision TypeApproved Estimated Cost of Development$375,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,750.00 Total Contributions Paid-$3,750.00 Payment Date8/04/2019 Total Contribution Outstanding$-
Application NumberPC-2019/483 Address
157 Mount Keira Road, MOUNT KEIRA NSW 2500
DescriptionTwo storey dwelling Decision Date10/04/2019 Decision TypeApproved Estimated Cost of Development$612,229.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$6,122.29 Total Contributions Paid-$6,122.29 Payment Date28/05/2019 Total Contribution Outstanding$-
Application NumberPC-2019/582 Address
10 Lee Street, WARRAWONG NSW 2502
DescriptionResidential - secondary dwelling Decision Date9/05/2019 Decision TypeApproved Estimated Cost of Development$114,210.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$571.05 Total Contributions Paid-$571.05 Payment Date25/06/2019 Total Contribution Outstanding$-
Application NumberPC-2019/439 Address
19 Caroline Street, CORRIMAL NSW 2518
DescriptionResidential - secondary dwelling Decision Date9/04/2019 Decision TypeApproved Estimated Cost of Development$162,880.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$814.40 Total Contributions Paid-$814.40 Payment Date15/04/2019 Total Contribution Outstanding$-
Application NumberDA-2019/252 Address
4 Kirala Avenue, MANGERTON NSW 2500
DescriptionResidential - alterations and additions Decision Date9/04/2019 Decision TypeApproved Estimated Cost of Development$177,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$885.00 Total Contributions Paid-$885.00 Payment Date15/05/2019 Total Contribution Outstanding$-
Application NumberDA-2019/8 Address
83 Princes Highway, CORRIMAL NSW 2518
DescriptionResidential - removal of concrete pond and construction of secondary dwelling and car space Decision Date9/04/2019 Decision TypeApproved Estimated Cost of Development$147,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$735.00 Total Contributions Paid-$735.00 Payment Date29/04/2019 Total Contribution Outstanding$-
Application NumberPC-2019/436 Address
30 Fairy Avenue, FAIRY MEADOW NSW 2519
DescriptionResidential - demolition of existing and construction of dwelling house Decision Date9/04/2019 Decision TypeApproved Estimated Cost of Development$515,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,150.00 Total Contributions Paid-$5,150.00 Payment Date18/04/2019 Total Contribution Outstanding$-
Application NumberDA-2019/191 Address
69 William Street, KEIRAVILLE NSW 2500
DescriptionResidential - alterations and additions and carport and pool Decision Date9/04/2019 Decision TypeApproved Estimated Cost of Development$347,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,470.00 Total Contributions Paid-$3,470.00 Payment Date5/06/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1516 Address
31A Murrawal Road, STANWELL PARK NSW 2508
DescriptionResidential - dual occupancy Decision Date9/01/2019 Decision TypeApproved Estimated Cost of Development$494,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,961.53 Total Contributions Paid-$4,961.53 Payment Date4/06/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1318 Address
31A Nebo Drive, FIGTREE NSW 2525
DescriptionResidential - dwelling house Decision Date9/01/2019 Decision TypeApproved Estimated Cost of Development$459,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,610.01 Total Contributions Paid-$4,610.01 Payment Date1/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1193 Address
32 Hillcrest Street, WOLLONGONG NSW 2500
DescriptionResidential - demolition of outbuildings, construction of multi dwelling housing and Subdivision - Strata title - three (3) lots Decision Date9/01/2019 Decision TypeApproved Estimated Cost of Development$500,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,000.00 Total Contributions Paid-$5,000.00 Payment Date30/01/2019 Total Contribution Outstanding$-
Application NumberPC-2019/559 Address
21 Industrial Road, UNANDERRA NSW 2526
DescriptionIndustrial Building - Alterations & Additions Decision Date8/05/2019 Decision TypeApproved Estimated Cost of Development$337,150.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,371.50 Total Contributions Paid-$3,371.50 Payment Date10/05/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1350 Address
10 Foster Street, HELENSBURGH NSW 2508
DescriptionResidential - demolition of existing dwelling house and construction of dual occupancy Decision Date8/02/2019 Decision TypeApproved Estimated Cost of Development$750,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$7,500.00 Total Contributions Paid-$7,500.00 Payment Date8/03/2019 Total Contribution Outstanding$-
Application NumberDA-2019/188 Address
26 High Street, THIRROUL NSW 2515
DescriptionResidential - construction of a dual occupancy (attached) and Subdivision - Torrens title - two (2) lots Decision Date7/05/2019 Decision TypeApproved Estimated Cost of Development$600,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$6,000.00 Total Contributions Paid-$6,000.00 Payment Date10/05/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1599 Address
30 Bulgo Road, HELENSBURGH NSW 2508
DescriptionResidential - demolition of existing structures and tree removals, construction of a dual occupancy and Subdivision - Torrens title - two (2) lots Decision Date7/03/2019 Decision TypeApproved Estimated Cost of Development$503,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,030.00 Total Contributions Paid-$5,030.00 Payment Date20/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1505 Address
21 Harper Lane, HELENSBURGH NSW 2508
DescriptionResidential - demolition of existing structures, construction of dual occupancy and Subdivision - Torrens title - two (2) lots Decision Date7/03/2019 Decision TypeApproved Estimated Cost of Development$580,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,800.00 Total Contributions Paid-$5,800.00 Payment Date21/03/2019 Total Contribution Outstanding$-
Application NumberDA-2019/114 Address
14 Amaroo Avenue, FIGTREE NSW 2525
DescriptionResidential - alterations and additions Decision Date7/03/2019 Decision TypeApproved Estimated Cost of Development$240,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,400.00 Total Contributions Paid-$2,400.00 Payment Date23/04/2019 Total Contribution Outstanding$-
Application NumberDA-2019/187 Address
22 Moreton Street, RUSSELL VALE NSW 2517
DescriptionResidential - dwelling house Decision Date7/03/2019 Decision TypeApproved Estimated Cost of Development$474,131.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,741.31 Total Contributions Paid-$4,741.31 Payment Date31/03/2019 Total Contribution Outstanding$-
Application NumberDA-2019/134 Address
2 Gardiner Place, HELENSBURGH NSW 2508
DescriptionResidential - alterations and additions Decision Date7/03/2019 Decision TypeApproved Estimated Cost of Development$180,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$900.00 Total Contributions Paid-$900.00 Payment Date3/04/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1458 Address
17 Ben Nevis Road, FARMBOROUGH HEIGHTS NSW 2526
DescriptionResidential - alterations and additions Decision Date7/02/2019 Decision TypeApproved Estimated Cost of Development$300,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,013.08 Total Contributions Paid-$3,013.08 Payment Date22/05/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1124 Address
22 Booyong Street, WEST WOLLONGONG NSW 2500
DescriptionResidential - dwelling house, retaining wall and tree removal Decision Date7/01/2019 Decision TypeApproved Estimated Cost of Development$667,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$6,670.00 Total Contributions Paid-$6,670.00 Payment Date23/01/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1511 Address
13 Stanhope Street, WOONONA NSW 2517
DescriptionResidential - alterations, additions and demolition Decision Date7/01/2019 Decision TypeApproved Estimated Cost of Development$475,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,770.71 Total Contributions Paid-$4,770.71 Payment Date16/04/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1570 Address
42 Gray Street, WOONONA NSW 2517
DescriptionResidential - demolition of existing structures, construction of a dual occupancy and Subdivision - Torrens title - two (2) lots Decision Date6/03/2019 Decision TypeApproved Estimated Cost of Development$600,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$6,000.00 Total Contributions Paid-$6,000.00 Payment Date13/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1605 Address
7 Henley Road, THIRROUL NSW 2515
DescriptionResidential - alterations and additions, including removal of x1 tree Decision Date6/03/2019 Decision TypeApproved Estimated Cost of Development$346,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,460.00 Total Contributions Paid-$3,460.00 Payment Date14/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1482 Address
230 Kanahooka Road, KANAHOOKA NSW 2530
DescriptionPet crematorium Decision Date6/03/2019 Decision TypeApproved Estimated Cost of Development$1,271,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$12,710.00 Total Contributions Paid-$12,710.00 Payment Date26/03/2019 Total Contribution Outstanding$-
Application NumberDA-2017/1153 Address
20 Northcote Street, COLEDALE NSW 2515
DescriptionResidential - dwelling house, retaining walls and removal of x1 tree Decision Date6/03/2019 Decision TypeApproved Estimated Cost of Development$522,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,307.54 Total Contributions Paid-$5,307.54 Payment Date19/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1431 Address
16 Sixth Avenue, PORT KEMBLA NSW 2505
DescriptionResidential - double storey dwelling house and retaining wall Decision Date6/02/2019 Decision TypeApproved Estimated Cost of Development$509,366.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,093.66 Total Contributions Paid-$5,093.66 Payment Date4/03/2019 Total Contribution Outstanding$-
Application NumberPC-2019/427 Address
130 Phillip Street, THIRROUL NSW 2515
DescriptionFirst floor addition Decision Date5/04/2019 Decision TypeApproved Estimated Cost of Development$275,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,750.00 Total Contributions Paid-$2,750.00 Payment Date15/04/2019 Total Contribution Outstanding$-
Application NumberDA-2019/67 Address
20-24 Flinders Street, PORT KEMBLA NSW 2505
DescriptionIndustrial - use of heavy vehicle repair and maintenance facility and construction of wash bay Decision Date5/03/2019 Decision TypeApproved Estimated Cost of Development$217,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,170.00 Total Contributions Paid-$2,170.00 Payment Date23/05/2019 Total Contribution Outstanding$-
Application NumberDA-2019/79 Address
11 Georgina Avenue, KEIRAVILLE NSW 2500
DescriptionResidential - Two storey dwelling Decision Date5/02/2019 Decision TypeApproved Estimated Cost of Development$483,684.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,836.84 Total Contributions Paid-$4,836.84 Payment Date13/02/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1632 Address
38 Grand View Parade, LAKE HEIGHTS NSW 2502
DescriptionResidential - demolition of existing dwelling house and construction of a dwelling house Decision Date5/02/2019 Decision TypeApproved Estimated Cost of Development$468,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,680.00 Total Contributions Paid-$4,680.00 Payment Date12/02/2019 Total Contribution Outstanding$-
Application NumberDA-2019/279 Address
14 Murphys Avenue, GWYNNEVILLE NSW 2500
DescriptionResidential - alterations and additions Decision Date4/04/2019 Decision TypeApproved Estimated Cost of Development$124,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$620.00 Total Contributions Paid-$620.00 Payment Date24/04/2019 Total Contribution Outstanding$-
Application NumberDA-2019/68 Address
6 Jardine Street, BULLI NSW 2516
DescriptionResidential - demolition of dwelling, construction of dual occupancy and Subdivision - Torrens title - two (2) lots Decision Date4/03/2019 Decision TypeApproved Estimated Cost of Development$785,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$7,850.00 Total Contributions Paid-$7,850.00 Payment Date3/06/2019 Total Contribution Outstanding$7,850.00
Application NumberDA-2018/1405 Address
19 Neeson Road, KEMBLA GRANGE NSW 2526
DescriptionResidential - dual occupancy and Subdivision - Torrens title - two (2) lots Decision Date4/03/2019 Decision TypeApproved Estimated Cost of Development$550,000.00 Contributions PlanWest Dapto Residential - Administration Total Contribution Levied$590.56 Total Contributions Paid-$590.56 Payment Date23/05/2019 Total Contribution Outstanding$-
Application NumberDA-2019/181 Address
68 Bambil Crescent, DAPTO NSW 2530
DescriptionResidential - dwelling house Decision Date3/04/2019 Decision TypeApproved Estimated Cost of Development$294,770.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,947.70 Total Contributions Paid-$2,947.70 Payment Date23/04/2019 Total Contribution Outstanding$-
Application NumberPC-2019/414 Address
50 Stuart Road, WARRAWONG NSW 2502
DescriptionResidential - secondary dwelling Decision Date3/04/2019 Decision TypeApproved Estimated Cost of Development$123,530.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$617.65 Total Contributions Paid-$617.65 Payment Date29/04/2019 Total Contribution Outstanding$-
Application NumberPC-2019/423 Address
38 Lawrence Hargrave Drive, AUSTINMER NSW 2515
DescriptionDemolition of existing dwelling and construction of a two storey dwelling Decision Date3/04/2019 Decision TypeApproved Estimated Cost of Development$250,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,500.00 Total Contributions Paid-$2,500.00 Payment Date28/05/2019 Total Contribution Outstanding$-
Application NumberPC-2019/545 Address
104 Farmborough Road, FARMBOROUGH HEIGHTS NSW 2526
DescriptionResidential - alterations and additions Decision Date2/05/2019 Decision TypeApproved Estimated Cost of Development$173,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$865.00 Total Contributions Paid-$865.00 Payment Date9/05/2019 Total Contribution Outstanding$-
Application NumberPC-2019/411 Address
108 Fowlers Road, DAPTO NSW 2530
DescriptionResidential - secondary dwelling Decision Date2/04/2019 Decision TypeApproved Estimated Cost of Development$136,823.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$684.12 Total Contributions Paid-$684.12 Payment Date4/04/2019 Total Contribution Outstanding$-
Application NumberDA-2019/254 Address
8 Gifford Street, COLEDALE NSW 2515
DescriptionResidential - demolition of existing dwelling, retaining wall and tree removal and construction of dwelling house, decks and retaining walls Decision Date1/05/2019 Decision TypeApproved Estimated Cost of Development$448,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,480.00 Total Contributions Paid-$4,480.00 Payment Date10/05/2019 Total Contribution Outstanding$-
Application NumberPC-2019/278 Address
309 Crown Street, WOLLONGONG NSW 2500
DescriptionInternal alterations to the existing health services facility Decision Date1/03/2019 Decision TypeApproved Estimated Cost of Development$1,232,000.00 Contributions PlanS94A Contribution Plan-City Centre Commercial Core Total Contribution Levied$24,640.00 Total Contributions Paid-$24,640.00 Payment Date8/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1443 Address
Warrawong Plaza, 43-65 Cowper Street, WARRAWONG NSW 2502
DescriptionCommercial premises - construction of new storage area for tenancy MM3 Decision Date12/12/2018 Decision TypeApproved Estimated Cost of Development$130,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$652.83 Total Contributions Paid-$652.83 Payment Date8/05/2019 Total Contribution Outstanding$-
Application NumberPC-2018/1756 Address
22 Tobruk Avenue, PORT KEMBLA NSW 2505
DescriptionDwelling - alterations and additions to dwelling Decision Date12/11/2018 Decision TypeApproved Estimated Cost of Development$228,897.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,288.97 Total Contributions Paid-$2,288.97 Payment Date23/11/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1814 Address
30 Cabbage Tree Lane, FAIRY MEADOW NSW 2519
DescriptionDemolishing existing structure and construct new dwelling Decision Date12/11/2018 Decision TypeApproved Estimated Cost of Development$306,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,060.00 Total Contributions Paid-$3,060.00 Payment Date11/12/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1605 Address
35 Pass Avenue, THIRROUL NSW 2515
DescriptionDwelling alterations and additions Decision Date12/10/2018 Decision TypeApproved Estimated Cost of Development$440,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,446.32 Total Contributions Paid-$4,446.32 Payment Date29/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/992 Address
2A Michael Street, GWYNNEVILLE NSW 2500
DescriptionResidential - dwelling house Decision Date12/09/2018 Decision TypeApproved Estimated Cost of Development$342,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,420.00 Total Contributions Paid-$3,420.00 Payment Date26/09/2018 Total Contribution Outstanding$-
Application NumberDA-2018/1016 Address
102 Blackman Parade, UNANDERRA NSW 2526
DescriptionResidential - alterations & additions Decision Date12/09/2018 Decision TypeApproved Estimated Cost of Development$150,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$750.00 Total Contributions Paid-$750.00 Payment Date15/10/2018 Total Contribution Outstanding$-
Application NumberDA-2018/571 Address
15 Armagh Parade, THIRROUL NSW 2515
DescriptionResidential - alterations and additions Decision Date12/07/2018 Decision TypeApproved Estimated Cost of Development$132,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$669.29 Total Contributions Paid-$669.29 Payment Date8/03/2019 Total Contribution Outstanding$-
Application NumberDA-2016/1795/B Address
Warrawong Plaza, 43-65 Cowper Street, WARRAWONG NSW 2502
DescriptionCommercial - alterations and additions to Warrawong Plaza shopping centre Modification B - reconfigure food tenancies, update facade materials and finishes, provide addition storage adjacent to loading facility, address compliance matters and re-word condition 10 - fire services Decision Date12/07/2018 Decision TypeApproved Estimated Cost of Development$1,099,264.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$11,031.35 Total Contributions Paid-$11,031.35 Payment Date1/08/2018 Total Contribution Outstanding$-
Application NumberPC-2018/967 Address
66 Stanley Avenue, FARMBOROUGH HEIGHTS NSW 2526
DescriptionResidential - Alterations and Additions Decision Date12/06/2018 Decision TypeApproved Estimated Cost of Development$110,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$550.00 Total Contributions Paid-$550.00 Payment Date8/08/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1437 Address
26 Bukari Street, WEST WOLLONGONG NSW 2500
DescriptionResidential - demolition of existing dwelling and construction of new dwelling Decision Date12/02/2018 Decision TypeApproved Estimated Cost of Development$440,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,411.65 Total Contributions Paid-$4,411.65 Payment Date13/06/2018 Total Contribution Outstanding$-
Application NumberPC-2018/273 Address
35 Five Islands Road, PORT KEMBLA NSW 2505
DescriptionIndustrial development - 33 Units Decision Date12/02/2018 Decision TypeApproved Estimated Cost of Development$7,966,200.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$79,662.00 Total Contributions Paid-$79,662.00 Payment Date22/02/2018 Total Contribution Outstanding$-
Application NumberDA-2018/45 Address
28 Otford Road, HELENSBURGH NSW 2508
DescriptionResidential - alterations and additions and swimming pool Decision Date12/02/2018 Decision TypeApproved Estimated Cost of Development$120,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$603.71 Total Contributions Paid-$603.71 Payment Date30/07/2018 Total Contribution Outstanding$-
Application NumberPC-2018/260 Address
89 The Crescent, HELENSBURGH NSW 2508
DescriptionConstruction of a secondary dwelling Decision Date12/02/2018 Decision TypeApproved Estimated Cost of Development$159,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$795.00 Total Contributions Paid-$795.00 Payment Date19/02/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1628 Address
7 Liamina Avenue, WOONONA NSW 2517
DescriptionResidential - demolition of existing dwelling and construction of new dwelling house and swimming pool Decision Date12/02/2018 Decision TypeApproved Estimated Cost of Development$583,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,830.00 Total Contributions Paid-$5,830.00 Payment Date11/03/2018 Total Contribution Outstanding$-
Application NumberDA-2018/1407 Address
11 Pooraka Avenue, WEST WOLLONGONG NSW 2500
DescriptionResidential - alterations and additions Decision Date11/12/2018 Decision TypeApproved Estimated Cost of Development$450,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,519.62 Total Contributions Paid-$4,519.62 Payment Date16/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1403 Address
39 Parrish Avenue, MOUNT PLEASANT NSW 2519
DescriptionResidential - alterations and additions Decision Date11/12/2018 Decision TypeApproved Estimated Cost of Development$130,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$652.83 Total Contributions Paid-$652.83 Payment Date13/02/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1392 Address
5 Old Port Road, PORT KEMBLA NSW 2505
DescriptionIndustrial - partial demolition of structure and construction of concrete driveway and retaining walls Decision Date11/12/2018 Decision TypeApproved Estimated Cost of Development$300,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,013.08 Total Contributions Paid-$3,013.08 Payment Date12/03/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1418 Address
31 Bulwarra Street, KEIRAVILLE NSW 2500
DescriptionResidential - alterations and additions Decision Date11/12/2018 Decision TypeApproved Estimated Cost of Development$265,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,661.55 Total Contributions Paid-$2,661.55 Payment Date8/04/2019 Total Contribution Outstanding$-
Application NumberDA-2018/1020 Address
328 Northcliffe Drive, LAKE HEIGHTS NSW 2502
DescriptionResidential - demolition of existing garage and shed, alterations and additions to existing dwelling house and construction of secondary dwelling Decision Date11/10/2018 Decision TypeApproved Estimated Cost of Development$215,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,163.20 Total Contributions Paid-$2,163.20 Payment Date24/01/2019 Total Contribution Outstanding$-
Application NumberPC-2018/1435 Address
16 Bellambi Lane, BELLAMBI NSW 2518
DescriptionCommercial - proposed warehouse Decision Date11/09/2018 Decision TypeApproved Estimated Cost of Development$1,100,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$11,067.54 Total Contributions Paid-$11,067.54 Payment Date17/11/2018 Total Contribution Outstanding$-
Application NumberDA-2018/1010 Address
38 Imperial Drive, BERKELEY NSW 2506
DescriptionResidential - alterations and additions Decision Date11/09/2018 Decision TypeApproved Estimated Cost of Development$220,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,223.16 Total Contributions Paid-$2,223.16 Payment Date15/04/2019 Total Contribution Outstanding$-
Application NumberDA-2018/707 Address
44 Thames Street, WEST WOLLONGONG NSW 2500
DescriptionResidential - alterations and additions Decision Date11/07/2018 Decision TypeApproved Estimated Cost of Development$120,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$600.00 Total Contributions Paid-$600.00 Payment Date18/07/2018 Total Contribution Outstanding$-
Application NumberDA-2018/377 Address
7 Gowan Brae Avenue, MOUNT OUSLEY NSW 2519
DescriptionResidential - dwelling house Decision Date11/04/2018 Decision TypeApproved Estimated Cost of Development$249,180.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,498.40 Total Contributions Paid-$2,498.40 Payment Date15/05/2018 Total Contribution Outstanding$-
Application NumberDA-2018/356 Address
208 Princes Highway, FAIRY MEADOW NSW 2519
DescriptionResidential - demolition of existing dwelling, carport hardstand area and removal of 2 trees and construction of new dwelling house Decision Date11/04/2018 Decision TypeApproved Estimated Cost of Development$368,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,680.00 Total Contributions Paid-$3,680.00 Payment Date18/04/2018 Total Contribution Outstanding$-
Application NumberPC-2018/619 Address
82 Balgownie Road, FAIRY MEADOW NSW 2519
DescriptionResidential - alterations and additions Decision Date11/04/2018 Decision TypeApproved Estimated Cost of Development$138,074.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$690.40 Total Contributions Paid-$690.40 Payment Date30/04/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1292 Address
10 Canberra Road, LAKE HEIGHTS NSW 2502
DescriptionResidential Alterations and Additions including Ground Floor Addition, Driveway, Front Fence and Associated Retaining Walls Decision Date11/01/2018 Decision TypeApproved Estimated Cost of Development$185,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$931.58 Total Contributions Paid-$931.58 Payment Date19/03/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1024 Address
78 William James Drive, MOUNT KEMBLA NSW 2526
DescriptionResidential - alterations and additions to dwelling house including detached garage, retaining walls and tree removal Decision Date11/01/2018 Decision TypeApproved Estimated Cost of Development$220,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,229.33 Total Contributions Paid-$2,229.33 Payment Date31/08/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1140 Address
13 Toxteth Avenue, AUSTINMER NSW 2515
DescriptionResidential - alterations and additions to existing dwelling, demolition of existing shed and construction of secondary dwelling Decision Date11/01/2018 Decision TypeApproved Estimated Cost of Development$350,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,534.22 Total Contributions Paid-$3,534.22 Payment Date18/06/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1536 Address
2 Dick Street, CORRIMAL NSW 2518
DescriptionResidential - demolition of existing garage and pergola, removal of three (3) trees, construction of alterations and additions to existing dwelling including a new detached garage Decision Date11/01/2018 Decision TypeApproved Estimated Cost of Development$175,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$875.00 Total Contributions Paid-$875.00 Payment Date23/01/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1947 Address
39 Tunnel Road, HELENSBURGH NSW 2508
DescriptionResidential - secondary dwelling Decision Date10/12/2018 Decision TypeApproved Estimated Cost of Development$235,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$2,350.00 Total Contributions Paid-$2,350.00 Payment Date31/01/2019 Total Contribution Outstanding$-
Application NumberDA-2016/1795/D Address
Warrawong Plaza, 43-65 Cowper Street, WARRAWONG NSW 2502
DescriptionCommercial - alterations and additions to Warrawong Plaza shopping centre Modification D - to enlarge Tenancy K by 51 sqm, provide retractable weather awning to tenancy H and new pergola/cover to kiosk alfresco dining area Decision Date10/12/2018 Decision TypeApproved Estimated Cost of Development$397,574.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,993.07 Total Contributions Paid$3,975.74 Payment Date7/12/2018 Total Contribution Outstanding$-
Application NumberDA-2018/1139 Address
9 Lillipilli Place, WINDANG NSW 2528
DescriptionResidential - dwelling house Decision Date10/10/2018 Decision TypeApproved Estimated Cost of Development$503,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,060.89 Total Contributions Paid-$5,060.89 Payment Date5/12/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1648 Address
Figtree Grove, 19 Princes Highway, FIGTREE NSW 2525
DescriptionProposed fitout and uise as a food and drinks premises at shop 116 - Ariel's Burger Bar Decision Date10/10/2018 Decision TypeApproved Estimated Cost of Development$300,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,000.00 Total Contributions Paid-$3,000.00 Payment Date30/10/2018 Total Contribution Outstanding$-
Application NumberDA-2018/997 Address
7 Walang Avenue, FIGTREE NSW 2525
DescriptionResidential - demolition of existing structures and construction of dwelling house Decision Date10/09/2018 Decision TypeApproved Estimated Cost of Development$436,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,360.00 Total Contributions Paid-$4,360.00 Payment Date27/09/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1439 Address
16 The Parkway, BALGOWNIE NSW 2519
DescriptionResidential - demolish existing structure, remove tree, new dwelling house, retaining walls and driveway Decision Date10/09/2018 Decision TypeApproved Estimated Cost of Development$481,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,810.00 Total Contributions Paid-$4,810.00 Payment Date3/10/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1277 Address
1 Somerville Street, BULLI NSW 2516
DescriptionRemoval of garage and construction of secondary dwelling with attached verandah Decision Date10/08/2018 Decision TypeApproved Estimated Cost of Development$143,490.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$717.45 Total Contributions Paid-$717.45 Payment Date20/08/2018 Total Contribution Outstanding$-
Application NumberDA-2018/552 Address
19 Whiting Crescent, CORRIMAL NSW 2518
DescriptionResidential - demolition of existing structures and construction of dwelling house, detached garage/workshop and swimming pool Decision Date10/07/2018 Decision TypeApproved Estimated Cost of Development$529,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,308.63 Total Contributions Paid-$5,308.63 Payment Date27/08/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1104 Address
6 Lavender Street, BELLAMBI NSW 2518
DescriptionGround floor addition to rear of existing dwelling including new deck and swimming pool Decision Date10/07/2018 Decision TypeApproved Estimated Cost of Development$176,415.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$882.08 Total Contributions Paid-$882.08 Payment Date30/07/2018 Total Contribution Outstanding$-
Application NumberDA-2018/706 Address
6 Thalassa Avenue, EAST CORRIMAL NSW 2518
DescriptionResidential - alterations and additions Decision Date10/07/2018 Decision TypeApproved Estimated Cost of Development$200,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$1,003.52 Total Contributions Paid-$1,003.52 Payment Date1/11/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1432 Address
12 The Esplanade, THIRROUL NSW 2515
DescriptionResidential - demolition of existing dwelling house, construction of dual occupancy and Subdivision - Torrens title - two (2) lots Decision Date10/05/2018 Decision TypeApproved Estimated Cost of Development$588,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,880.00 Total Contributions Paid-$5,880.00 Payment Date18/06/2018 Total Contribution Outstanding$-
Application NumberDA-2018/67 Address
1 Station Street, EAST CORRIMAL NSW 2518
DescriptionResidential - demolition of existing dwelling house and construction of dwelling house in addition to existing multi dwelling housing and Subdivision - Torrens title - two (2) lots Decision Date10/04/2018 Decision TypeApproved Estimated Cost of Development$330,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,308.74 Total Contributions Paid-$3,308.74 Payment Date28/06/2018 Total Contribution Outstanding$-
Application NumberDA-2018/380 Address
9 Kanahooka Road, KANAHOOKA NSW 2530
DescriptionResidential - dwelling house Decision Date10/04/2018 Decision TypeApproved Estimated Cost of Development$409,260.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,103.44 Total Contributions Paid-$4,103.44 Payment Date3/05/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1456 Address
30 Griffiths Avenue, PORT KEMBLA NSW 2505
DescriptionChange of Use from Dual Occupancy to a Dwelling and Residential Alterations and Additions to the Dwelling Decision Date10/01/2018 Decision TypeApproved Estimated Cost of Development$152,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$778.24 Total Contributions Paid-$778.24 Payment Date3/03/2019 Total Contribution Outstanding$-
Application NumberPC-2018/1754 Address
32 London Street, BERKELEY NSW 2506
DescriptionConstruction of a secondary dwelling Decision Date9/11/2018 Decision TypeApproved Estimated Cost of Development$144,090.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$720.45 Total Contributions Paid-$720.45 Payment Date21/11/2018 Total Contribution Outstanding$-
Application NumberPC-2018/1576 Address
2 Wattle Street, WINDANG NSW 2528
DescriptionProposed alterations and additions Decision Date9/10/2018 Decision TypeApproved Estimated Cost of Development$120,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$600.00 Total Contributions Paid-$600.00 Payment Date25/10/2018 Total Contribution Outstanding$-
Application NumberDA-2018/1019 Address
43 Aldridge Avenue, EAST CORRIMAL NSW 2518
DescriptionResidential - dual occupancy and Subdivision - Torrens title - two (2) lots Decision Date9/10/2018 Decision TypeApproved Estimated Cost of Development$385,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$3,873.64 Total Contributions Paid-$3,873.64 Payment Date9/11/2018 Total Contribution Outstanding$-
Application NumberDA-2017/619 Address
14 Cowper Street, HELENSBURGH NSW 2508
DescriptionResidential - new dwelling to create dual occupancy, extension to existing verandah and Subdivision - Torrens title - two (2) lots Decision Date9/05/2018 Decision TypeApproved Estimated Cost of Development$450,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,500.00 Total Contributions Paid-$4,500.00 Payment Date15/09/2017 Total Contribution Outstanding$-
Application NumberDA-2018/255 Address
83 Callows Road, BULLI NSW 2516
DescriptionResidential - dwelling house and retaining walls Decision Date9/05/2018 Decision TypeApproved Estimated Cost of Development$558,820.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$5,607.88 Total Contributions Paid-$5,607.88 Payment Date29/10/2018 Total Contribution Outstanding$-
Application NumberDA-2018/262 Address
19 Williams Crescent, RUSSELL VALE NSW 2517
DescriptionResidential - Demolition of the existing dwelling and ancillary structures and construction of new 2 storey dwelling house Decision Date9/04/2018 Decision TypeApproved Estimated Cost of Development$441,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$4,410.00 Total Contributions Paid-$4,410.00 Payment Date30/04/2018 Total Contribution Outstanding$-
Application NumberPC-2018/451 Address
7 Hertford Street, BERKELEY NSW 2506
DescriptionResidential - secondary dwelling Decision Date9/03/2018 Decision TypeApproved Estimated Cost of Development$106,155.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$530.78 Total Contributions Paid-$530.78 Payment Date19/03/2018 Total Contribution Outstanding$-
Application NumberDA-2017/1761 Address
Lysaghts Oval, 147 The Avenue, FIGTREE NSW 2525
DescriptionAlterations and additions to create high performance training area Decision Date9/03/2018 Decision TypeApproved Estimated Cost of Development$150,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$750.00 Total Contributions Paid-$750.00 Payment Date27/04/2018 Total Contribution Outstanding$-
Application NumberPC-2018/474 Address
26 Industrial Road, UNANDERRA NSW 2526
DescriptionIndustrial building Decision Date9/03/2018 Decision TypeApproved Estimated Cost of Development$882,000.00 Contributions PlanS94A Contribution Plan Total Contribution Levied$8,820.00 Total Contributions Paid-$8,820.00 Payment Date19/03/2018 Total Contribution Outstanding$-