Works on this upgrade will be completed in three stages.
Stage 1: Fowlers Road (South) – formerly known as Daisy Bank Drive
We'll be starting Stage 1 of the Cleveland Road upgrade in mid-March 2025. Works are expected to take nine months, subject to weather.
Traffic controls will be in place. Vehicle access and a designated pedestrian path will be maintained throughout the works.
Road upgrades will include:
- 440 metres of road will be widened from two to four travel lanes and include kerb and gutter, stormwater drainage and street lighting
- The existing shared path on the eastern side of the road will be upgraded
- A new shared path will be built on the western side of the road.
Stages 2 and 3: Cleveland Road
This stage covers approximately 2.5 km stretch of road west from Fowlers Road intersection. Road upgrades will include:
- Stage 2 of Cleveland Road – 820m widened from two to four travel lanes
- Stage 3 of Cleveland Road – 1780m widened to two travel lanes with kerbside parking on both sides
- Road regrading (reshaping to make the road smoother and improve drainage), kerb and gutter, stormwater drainage, street lighting and a shared path on the northern side of Cleveland Road. A second shared path will be constructed on the southern side of the road after the services have been installed as part of the future subdivisions.
- Intersection upgrade and installation of traffic lights at Fowlers Road and Cleveland Road
We'll be working closely with the community to manage the impacts of construction during all stages.
The Cleveland Road upgrade project is proudly co-funded by Restart NSW in association with Wollongong City Council.