Railway Street Debris Control Structure

We installed a debris control structure and finished channel works on North Corrimal Creek, immediately upstream (on the western side) of the culverts near Memorial Drive and Railway Street.

Colgong Crescent Footbridge

We replaced the footbridge over Towradgi Creek between Colgong Cresent, Towradgi, and Linga Street, East Corrimal. The new bridge is higher to improve the flow of water and reduce the amount of debris trapped under the bridge.

Tarrawanna Flood Mitigation Work

We’ve finished multiple works in Tarrawanna to improve water flow and reduce blockages from debris. These works included:

  • Culvert improvements in Justine Avenue
  • Cutting an opening in the wall at the rear of 2 Bellambi Street to reduce the likelihood of damage from floods
  • Creating a low earth mound at Cheryl Place to direct floodwater away from houses.

Lemrac Avenue Flood Mitigation Works

These works to reduce the impact of floodwaters along Lemrac Avenue south of the intersection with Willow Grove, Corrimal, included:

  • Installing flood-proof walls on the boundaries of several properties to limit damage by water and debris
  • Installing a debris trap and reshaping the creek
  • Installing a trash rack at the inlet of the Lemrac Avenue culvert to reduce the chance of blockages.

Voluntary Purchase

Nine properties in this catchment were earmarked for a voluntary purchase scheme. Four of these properties on Pioneer Road, Towradgi, and one on Willow Grove, Corrimal, have already been purchased and cleared by Council.