We held a Blitz at Corrimal, around the Memorial Park area, on 6 August 2026.

During this Blitz, we:

  • Did maintenance work on more than 25 trees, planted about 600 plants and trees, and installed 21m2 of mulch
  • Pressure cleaned more than 2,800m2 of footpath, as well as the bus shelter
  • Repaired three pieces of street furniture, replaced the bus stop seat, and cleaned and painted 15 street furniture items
  • Installed 30m2 of turf and 7m3 of soft fall playground mulch in Luke's Place Playground
  • Used two tonnes of crushed granite, five tonnes of soil and two tonnes of road base
  • Replaced 18 street signs, straightened three street poles and replaced one street pole
  • Replaced 12 rubbish bins
  • Repaired more than 10 trip hazards
  • Installed two sandstone blocks, replacing log fencing
  • Removed lots of stickers and posters, removed or painted over graffiti, and picked up countless pieces of rubbish.