If you want to report a problem about current construction or demolition, you should first check if the building site has a sign showing details of the certifier (also called a Principal Certifier). It’s their role to make sure things are being done correctly.
You should try to contact the certifier to report any problems.
You can report an issue to Council if:
- Council is the certifier
- You can’t reach the certifier, or they did not help you
- There isn’t a sign or you don’t know who the certifier is
- There is an active pollution incident occurring.
You can also call us on (02) 4227 7111 to check who the certifier is if you’re not sure.