Use space to open navigation items

Berkeley's turn for a Blitz was on 23 July 2026.

  • 350m2 of footpaths and street furniture were pressure washed
  • 550m2 of mulch was laid
  • 11 gardens and garden beds were maintained or repaired
  • 10 trees were pruned
  • 25 regulatory signs and posts were repaired
  • Lots of graffiti was removed or painted over
  • A full truck load of illegally dumped rubbish and litter was removed.