Before work starts, a pre-construction meeting must be held with the developer, construction personnel and Council.

Call us on (02) 4227 7111 to arrange a pre-commencement meeting.

During construction, the contractor and project manager of the works must adhere to Council’s Subdivision Policy PDF, 1723.35 KB. This policy outlines the points at which the Principal Certifier must conduct inspections – see Annexure CQC-A for details.

The site must also be managed during high wind or large rainfall events to protect the environment and surrounding areas. The NSW Office of Environment and Heritage has a guide, known as the ‘Blue Book’, which outlines how soil and stormwater should be managed during construction.